Category Archives: -Uncategorized-

Project Get Ready

Here is a novel, albeit vague, idea.  Project Get Ready is a community organizer, so to speak, helping reach President’s Obama’s goal of 1 million plug-in cars by 2015.  Community members in Portland, Oregon; Indianapolis, Indiana (my state); and Raleigh, North Carolina have already agreed to work with Rocky Mountain Institute’s Project Get Ready.  Basically, this project is creating community activism in selected areas that will help organize dealerships, charging stations, manufacturers, local government, and motorists for electric vehicles. Hopefully, through this program we can overcome the barriers (see below) that have slowed the proliferation of electric cars. So go to the Project Get Ready site and see what you can do.  I know I will; because I am pleased to see my state as a major player in this endeavor.

PRESS RELEASE:

Rocky Mountain Institute’s Project Get Ready prepares the nation for the electric vehicle transition with 20 pioneering cities.

Ready, Set, GO! RMI’s Mobility and Vehicle Efficiency Team (MOVE) to collaborate with cities and technical experts to create a prioritized menu of strategies that will encourage adoption of plug-in vehicles. Check out www.projectgetready.com for our menu and more information.

Snowmass CO, February 24, 2009 – Rocky Mountain Institute (RMI) today announced the launch of Project Get Ready, an initiative that emerged from October’s Smart Garage Summit (see http://move.rmi.org/smart-garage.html for more) and aims to help communities prepare for and welcome plug-in vehicles including full battery electric, plug-in hybrid electric, and converted hybrid or internal combustion vehicles. Today they launch the initiative, including the website (www.projectgetready.com) and a “menu” listing the actions that communities must take to be truly ready for the plug-in transition.

Many communities are working to accelerate the adoption of plug-in vehicles. These pioneering communities do not yet have a way to share best practices and lessons learned. Moreover, automakers have no way to find all the places that are working to get ready for plug-in vehicles, and evaluate their progress and consumer interest. This missing connection has been cited by automakers as a critical barrier to committing to higher plug-in vehicle production.

Project Get Ready will collaborate with targeted communities that have started convening local players to develop and implement plug-in adoption plans, utilizing RMI’s universally recognized convening power, as well as detailed technical analysis.

Community members in Portland, Oregon; Indianapolis, Indiana; and Raleigh, North Carolina soon expanding to the Triangle region have already agreed to work with RMI’s Project Get Ready. Project manager and MOVE Consultant Laura Schewel says, “These pioneering communities represent widely different locations, demographics, economies and cultures, proving that plug-in vehicles will be an important transformation across the nation.”

Schewel continued, “plug-in vehicles are a revolution for the consumer and will transform the way we move from place to place, and the way we think about using energy. But each community is unique-they have different commuting patterns, parking concerns, demographics, local businesses, and cultures. Instead of battling this diversity, Project Get Ready welcomes it, allowing communities to get ready in their own way. I think this approach will lead to a faster and better arrival for plug-in vehicles and I am thrilled to have Portland, Indianapolis, and Raleigh in the conversation. With this project, we can help get the nation to President Obama’s goal of 1 million plug-ins by 2015…and maybe even beat it.”

Paul Mitchell, of the Central Indiana Corporate Partnership, highlighted the economic development opportunity xEV’s offer, saying, “We see the creation of an xEV ecosystem as an economic development opportunity. Not only can we deliver a more efficient transportation solution but our workforce can develop and manufacture the vehicle and smartgrid technologies needed to make the system work.”

Pete Barkey of General Motors highlighted the need for public-private partnership to introduce and promote plug-in vehicles, saying, “cars don’t necessarily sell themselves, especially with new, unfamiliar and often expensive technology. Our best chance of successfully making the transition from gasoline-powered vehicles to electrically-driven vehicles is to work with communities to help them become plug-in vehicle friendly. Organizations like Rocky Mountain Institute are helping to create a roadmap for regions around the country to become “plug-in ready.”

Mayor Charles Meeker of the City of Raleigh said that, “The Triangle area is proud to be the leader on the East Coast in preparing for the plug-in electric and hybrid-electric revolution. We are delighted to be partnering with Progress Energy, Advanced Energy and Rocky Mountain Institute to make Project Get Ready happen here. Project Get Ready is in harmony with the City of Raleigh’s mission statement. It focuses on 21st century environmental, cultural, and economic sustainability.”

We think widespread adoption of electric vehicles can strengthen our industry, address climate change, and reduce our dependence on foreign oil,” said Joe Barra, director of customer energy resources for Portland General Electric. “PGE is teaming up with business customers, the state of Oregon, auto manufacturers, and local governments to help develop industry standards and install and test charging stations, and we’re enthusiastic about the work the Rocky Mountain Institute is doing to help utilities and cities around the country coordinate their efforts and learn from one another’s experience.”

For Project Get Ready, RMI is specifically:
• TODAY, launching a dynamic “menu” of strategic actions that city and regional leaders can enact to be a plug-in pioneer, based on input from technical advisers and cities already engaged in implementing plug-ins. In this menu, RMI will analyze the “business case” for each action from the perspective of several key stakeholders (city gov’t, employers, consumers, etc.). The top 15 are listed at the end of this release.
• TODAY, launching a web database of all national (and some international) plug-in readiness activities.
• Work one-on-one with at least three cities on creating their readiness coalitions and charters. Portland, Indianapolis Area, and Raleigh/Triangle will be the first three.
• Convene at least 20 cities as well as technical players regularly to discuss their lessons learned and best practices, and report these conversations on our website and materials. Some of our partner cities will have their own plans underway, others will be starting from the ground up.
• Provide a benchmark that will allow cities/regions to “prove” that they are ready for mass adoption of PHEVs/EVs, and have taken meaningful steps to support this critical green technology (this may take the form of a seal of approval or certification like the LEED system that gauges readiness).
• Document the progress made by participant cities in order to help quantify future demand and make it more transparent to industry (how much, where, and what type of support to expect) for PHEVs/EVs.

RMI’s MOVE team is currently in the process of selecting more participant cities that seek to lead the charge toward the electric revolution. The project will be entirely open to the public, and can be followed by the initiative’s website at www.projectgetready.com

###

About RMI

Rocky Mountain Institute is an independent, nonpartisan, entrepreneurial, nonprofit “think-and-do tank.” It fosters the efficient and restorative use of resources to make the world secure, just, profitable, and life-sustaining. For more information, visit www.move.rmi.org.

TOP 15 ACTIONS FOR COMMUNITY LEADERS-IN BUSINESS, GOVERNMENT, CIVIC GROUPS, EDUCATION, AND BEYOND-TO TAKE TO BE PLUG-IN READY
For more, visit projectgetready.com

15 “Must Have” Actions*
Suggested stretch target: 2% of registered vehicles by the end of 2015.

Barrier: Not enough cars in the pipeline, OEMs need proof of future consumer demand
1. Corporate/city/state fleets commit to buy a certain number of plug-ins (RFPs for major purchases or conversions).
2. Stakeholder group provides a place for interested consumers/fleets to register early, and put cash down to reserve plug-ins (cash used for readiness where possible).

Barrier: How can we manage this as a multi-sector, city-wide project?
3. Create collaborative stakeholder group within the community to help regulatory, commercial, and community interests align. Sign on to a clear regional plan (based on this menu!). Plan should give equal consideration to conversions.
4. Have one “champion” whose job it is to keep this group moving forward, who has authority

Barrier: How can we bring down upfront costs for consumers?
5. Work with banks and dealers to offer low-interest loans for plug-ins, based on projected lower operating costs from gas savings.
6. Bundle all key incentives at vehicle point of purchase (home charger vouchers, rebates, etc.)

Barrier: Consumer hesitation at diving into a new paradigm for mobility
7. Perks: access to HOV lanes, free tolls/downtown parking, reserved airport parking.
8. Create consumer, city government, local business and utility education plans including test drives and “quick lease” options to individual and fleet consumers as well as high profile drivers.
9. Reduced (or free) electricity rates for charging.

Barrier: Red tape around infrastructure installation
10. Fast-track permitting for charging stations.
11. Ensure new and reconstruction/renovation building codes support the operation of plug-ins.

Barrier: What if these cars exacerbate my peak load?
12. Tie provisions of free home and public charge spots, as well as free or cheaper electricity, to either utility override power or “no charge” times.

Barrier: Who will pay for infrastructure?
13. Local employers/retailers provide some charge stations at parking decks.
14. Install public charge spots in high-traffic zones and parking areas, either with public money (via utility or gov’t for the first 2% of vehicles) or private money that uses the stations to market.
15. Provide affordable and available-or free-Level 2 home-charger/driveway circuit installation.

Stimulus bill is good news for plug-ins, public transit, trains, and smart grid

Here, AutoBlogGreen cut the pork and found what Obama’s stimulus bill means for our future in green transportation.  Overall, this bill is very encouraging. However, it will take years before these measures can effect our economy (why many antsy senators opposed it).  We should have done this 8 years ago:

  • As the Environmental Law & Policy Center and CNN note, high-speed and inner-city rail made out like bandits. The first version of the stimulus bill, written in the House, set aside $300 million for these trains. This ballooned to $8 billion – along with $6.9 billion for public transportation and $1.3 billion for Amtrak – by the time it was done.
  • Plug-in vehicles – as well as hybrids and fuel cell EVs – get a $2 billion investment for advanced battery technologies. The number of vehicles that are eligible for the plug-in electric drive vehicle credit jump up to 200,000 vehicles per manufacturer. The EDTA is happy with that, but is disappointed that the PHEV credit is capped at $7,500 and doesn’t apply to big vehicles (those that weigh over 14,000 lbs).
  • An upgraded smart grid is helped out by $4.5 billion for development and deployment.
  • Traditional cars don’t lose out, either. People who buy a new car in 2009 and who earn less than $125,000 individually or $250,000 jointly can deduct the sales tax.

White Zombie: Worlds Fastest Street Legal Electric Car

John Whalen’s 1972 Datsun 1200 is powered by 60 lead-acid batteries in his trunk and back seat. In a quarter mile, he can hit speeds of 107 miles per hour in less than 12 seconds. In this OPB special you see Whalen and his “White Zombie” whip up on muscle cars at the dragstrip. Towards the end you see him set world records after he is loaned A123 Systems lithium ion batteries, increasing horsepower and lightening the car by 700 pounds.

A123 Systems Applying for Government Loans

From Autobloggreen today:

A123 Systems announced today that it has applied for $1.84 billion in loans from the Department of Energy to help contribute to the $2.3 billion required to pay for the construction of battery plants in the United States. In what should be good news for Michigan, the first of the facilities A123 is planning would be located there. If A123 gets the funds, it plans to have enough cell manufacturing capacity in place by 2013 to support 5 million hybrid vehicles or half a million battery electric vehicles. The factories would produce employ 14,000 people when fully operational.

A123 claims to be working with seven different automakers right now on 19 different vehicle programs. Those include General Motors for the plug-in hybrid Saturn Vue and the Chevy Volt and Chrysler with its electric programs through its ENVI division. A123 is also working with Better Place on its charging and battery swap network programs. There’s no word so far on when a decision on the application might be made or construction might start.

14 US Companies Form Alliance to Create Super Battery

This post appeared in AutoBlogGreen on December 20, 2008:

A Voltron for lithium batteries? 14 companies, Argonne National Lab join forces

Posted Dec 20th 2008 at 3:03PM by Sebastian Blanco
Perhaps a flock-like approach to building lithium batteries for vehicles is what it’ll take. A new alliance has been formed between the Argonne National Laboratory and 14 US companies to try and “perfect” li-ion batteries for cars, the lab announced this week. The alliance, called The National Alliance for Advanced Transportation Battery Cell Manufacture, will ask for between $1 and $2 billion from the US government over five years to help with the task. Much has been made of the way that America is losing the advanced battery race to Asian countries, and an Argonne spokesman said that, “A small, fragmented (U.S.) battery industry will not long survive in the face of determined Asian competition.”

The companies involved in the alliance include:

  • Johnson Controls-Saft Advanced Power Solutions
  • 3M Co
  • ActaCell
  • All Cell Technologies
  • Altair Nanotechnologies Inc
  • Eagle Picher Industries Inc
  • EnerSys
  • Envia Systems
  • FMC Corp
  • MicroSun Technologies
  • Mobius Power
  • SiLyte
  • Superior Graphite
  • Townsend Advanced Energy

Interesting Idea…

I was browsing the internet today when I happened upon an interesting user comment at hybridcars.com. It didn’t really have much to do with the article, which was about the accusation of Nicolas Sarcozy being too electric car friendly (Nothing wrong with that!). But it was a fascinatingly simple idea:

dirkalan:
“they should develope (sic) an all electric car for in town use. then a small trailer with a gas electric generator for the few times long distance is needed. this generic trailer could power different brands of cars. could be shared between a number of people. could be rented.”

Genset

What he is describing is a genset trailer and it isn’t a completely new idea. Here is a full description:

A genset trailer is a range extending device for use with battery electric vehicles consisting of an internal combustion engine and an electrical generator (collectively called a genset). They run on traditional fuels such as gasoline or diesel and are sized to provide the continuous power requirements for the vehicle they are used with. Most small to midsized passenger vehicles would require 15 to 20 kW for unlimited freeway travel as long as fuel were available. Larger vehicles could require 30 kW or more of power depending on how heavy and/or un-aerodynamic they happen to be.

One such trailer is the AC Propulsion backtracking Long Ranger range extending gas fueled trailer, making it a gas-electric series plug-in hybrid electric vehicle. This trailer used a 500 cc Kawasaki engine with a 9.5 gallons (40 liter) fuel tank and achieved 30 to 35 mpg (6.72 to 7.84 litres/100 km). It’s rated at 20 kW DC output and can maintain 60 to 80 mph (95 to 128 km/h). -Wikipedia, Genset trailer

I feel this concept is not tossed around enough. A gas powered electric generator on a trailer would not be expensive. We have a surplus of old, small combustion engines in our salvage yards. And one could be shared within an entire neighborhood for family trips. It could easily be provided by a rental service too.  The only downside would be the added weight creating additional draw on the battery.